To build a 2500m2 two tier mezzanine, electrics, fire alarms and building works including dilapidations. Having secured a large unit in the nearby vicinity to their current property, International Copiers had acquired a new 1890m2 warehouse to fill which also had masses of headroom to utilise. STS Storage Systems were invited to tender for the project and wasted no time in completing a full survey and initiating a full brief. The outgoing tenant was still occupying the building meaning the area was full of stock and pallet racking, making the situation more complex. A large industrial generator occupied a corner section of the warehouse which needed to be removed. STS Storage Systems were appointed on the basis that the overall two tier mezzanine proposal fitted the customers brief and was the most comprehensive and competitive. International Copiers were strict on timescales and the ability of STS Storage Systems to meet such deadlines also helped to secure the order.

The Solution

The project was large and complex and required meticulous planning and compliance to CDM (construction, design and management) regulations to ensure a safe site and well run site. STS Storage Systems set about allocating a dedicated project manager to ensure that the project ran on time, on budget and was safe for the numerous contractors and customers alike. The dilapidations began which included removing studwork walls, electrics and a diesel operated generator. The cost of removing specialist ducting was prohibitive and remained in situ. We designed our two tier mezzanine floor around the ducting to accommodate this ducting and save the client an additional cost. STS Storage Systems ensured that all the complex site conditions were met, supplying a one stop shop for the client safely, on time and on budget.

How Was It Achieved?

Mezzanine Floor
  • Two tier mezzanine floor
  • 4.8kn/m2 loading
  • BRE 437 digest
  • Fire rated to one hour
  •  Total six staircases
  • Bespoke pallet gates
  • Full geo technical floor test
Dilapidations
  • Removal of stud work
  • Safe disposal of various materials
  • Specialist removal of generator
Build Works
  • Block work wall knock through
  • Installation of one hour fire rated door
  • Ceiling and fascia to mezzanine
  • Carpentry for bespoke door frame
Lighting / Electrics
  • T8 Lighting scheme fitted throughout
  • Emergency lighting
  • Smoke detection
  • New fire alarm system
  • Decommission of air conditioning
Download the case study

GET IN TOUCH

BOOK A FREE SITE VISIT

Please complete your details below. A member of the team will get back to you to book in your site visit at a convenient day and time to you.

Should you wish to contact us via phone, please call 01753 364109.

    Book a Site Visit Form