To build a 2500m2 two tier mezzanine, electrics, fire alarms and building works including dilapidations. Having secured a large unit in the nearby vicinity to their current property, International Copiers had acquired a new 1890m2 warehouse to fill which also had masses of headroom to utilise.
STS Storage Systems were invited to tender for the project and wasted no time in completing a full survey and initiating a full brief. The outgoing tenant was still occupying the building meaning the area was full of stock and pallet racking, making the situation more complex. A large industrial generator occupied a corner section of the warehouse which needed to be removed.
STS Storage Systems were appointed on the basis that the overall two tier mezzanine proposal fitted the customers brief and was the most comprehensive and competitive. International Copiers were strict on timescales and the ability of STS Storage Systems to meet such deadlines also helped to secure the order.
The project was large and complex and required meticulous planning and compliance to CDM (construction, design and management) regulations to ensure a safe site and well run site.
STS Storage Systems set about allocating a dedicated project manager to ensure that the project ran on time, on budget and was safe for the numerous contractors and customers alike. The dilapidations began which included removing studwork walls, electrics and a diesel operated generator. The cost of removing specialist ducting was prohibitive and remained in situ.
We designed our two tier mezzanine floor around the ducting to accommodate this ducting and save the client an additional cost.
STS Storage Systems ensured that all the complex site conditions were met, supplying a one stop shop for the client safely, on time and on budget.
Mezzanine Floor
Dilapidations
Build Works
Lighting / Electrics
For more information about how we can help with your warehouse storage requirements, please get in touch and a member of the team will get back to you shortly.
Call today: 01753 364109
Tel: 01753 364109
STS Storage Systems
Unit 5 Lidstone Court
George Green
Bucks
SL3 6AG
COPYRIGHT © STS STORAGE 2025. ALL RIGHTS RESERVED.
Please complete your details below. A member of the team will get back to you to book in your site visit at a convenient day and time to you.
Should you wish to contact us via phone, please call 01753 364109.
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |