MCP Engineering – Pallet Racking and Mezzanine Floor Bishop’s Stortford

MCP Engineering – Pallet Racking and Mezzanine Floor Bishop’s Stortford

40+ Years of Experience

Smarter Storage Systems

Free on-site Survey

Background

Founded in 2004, MCP Engineering Plastics is a leading UK manufacturer and supplier of high-performance semi-finished and machined plastic components. The company holds ISO 9001:2015 accreditation and specialises in both standard and bespoke engineering plastic solutions for its clients.

In June 2024, STS Storage Systems was appointed to design and install a new pallet racking system, a mezzanine floor, and a ground-floor office within MCP’s 11,100 sq. ft warehouse in Bishop’s Stortford. The project was part of a strategic expansion to replicate and enhance the company’s existing facility in Matching Green.

MCP Case Study racking image
Racking installation
MCP Case Study mezzanine image
Mezzanine installation

The Challenge

MCP Engineering needed a customised pallet racking system to handle a mix of heavy hand-loaded plastic products, bulk materials and pallets of varying weights and sizes. The new warehouse was significantly taller (10–12 m high), presenting an opportunity to maximise vertical storage space while maintaining clear operational zones for fork truck movement.

In addition, STS was tasked with designing a ground-floor warehouse office beneath an existing civil mezzanine, requiring careful integration of a new 49.3 m² steel mezzanine floor above with fire-rated construction and limited headroom.

MCP Case Study mezzanine image
Mezzanine lift and Racking installation

The Solution

After a comprehensive survey of the building and its existing structures, STS designed a bespoke pallet racking layout to accommodate both bulk and hand-picked storage zones. This included heavy-duty Link 51 XL racking with timber decking and integrated chipboard pigeon-hole shelving for long plastic components.

The mezzanine floor was engineered for a 4.8 kN/m² loading capacity and finished with fire-rated suspended ceilings, column casings, and fascias to meet safety requirements. A single utility staircase and swing pallet gate provide safe access for materials handling via fork truck.

The ground-floor office was constructed from Troax Elan double-skin steel partitioning with integrated glazing and horizontal blinds, creating a secure and professional workspace finished in white RAL 9010 powder-coated paint.

MCP Case Study office image
Mezzanine Office installation

How We Did It

The Result

The completed installation gives MCP Engineering a robust, future-proof storage solution tailored to their specialist plastic manufacturing operations — optimising space, workflow and long-term flexibility within their new Bishop’s Stortford facility. View Case Study pdf

Project Gallery

More Storage Solutions Case Studies

Discover more case studies showcasing our expertise in pallet racking, warehouse design, and seamless project delivery.

GET IN TOUCH

BOOK A FREE SITE VISIT

Please complete your details below. A member of the team will get back to you to book in your site visit at a convenient day and time to you.

Should you wish to contact us via phone, please call 01753 364109.

    Contact Form