London Underground Warehouse Relocation

The Tube lines Transplant Stores responsible for storing numerous spare parts for the maintenance and repairs of trains had to relocate from their current storage area (in the main depot building), into a purpose-built warehouse between two tracks at the Ruislip site.

Read more »
Mr Central Heating

Mr Central Heating

Mr Central Heating was bursting at the seams in their current unit, the nature of their business means that they have a hugely diverse product range and a large number of SKUs (stock keeping units) ranging in physical size, volume and fast-moving products. They needed more space, and quickly!

Read more »
Smash Sports case study STS Storage

Smash Sports

Smash Sports are exclusive distributors for the leading Technifibre products synonymous in the Squash and Tennis arena. To compliment their product portfolio they also carry the Salming range of sports footwear, prominent in many sports ranging from running to racket sports. As a forward-thinking and passionate company Smash Sports wanted to extend and compliment their products with a new range of bags, thus needing to create additional storage in their unit.

Read more »
Hazchem Safety case study STS Storage

Hazchem

Hazchem approached us to come up with a solution that would increase their number of pick locations, but not slow down their pick and pack operation. Starting in March 2016 – STS Storage produced a number of drawings, one included an extension to their mezzanine floor. Read the full case study and see the final results.

Read more »
Angels Costumes case study STS Storage

Angels Costumes

Angels Costumes was founded in 1813 by Daniel Angel, a young tailor from Frankfurt, who originally began his business in London selling second-hand clothing. Daniel eventually opened a shop and it was not until an actor asked if he could rent a suit rather than buy it that the hire business took off. Find out the challenge proposed to us and how we completed the project with minimal disruption, on time and on budget.

Read more »
The Modern Man case study STS Storage

The Modern Man

The Modern Man had outgrown its current warehouse facility due to its overwhelming success. The company needed a flexible shelving and racking system to accommodate the numerous products in their portfolio. The company approached us to help them with their solution.

Read more »
Sass and Belle case study STS Storage Systems

Sass & Belle

Having moved Sass and Belle to its current location in Brixton London 5 years ago (already 8 times bigger than the previous warehouse) STS Storage Systems LTD were consulted to help find a suitable warehouse and design the shell with a modern compact and efficient working environment.

Read more »

Mills Limited

To meet Mills increasing demand to supply to the trade they took ownership of an adjoining unit. Looking to maximise capacity and with an eye on further growth they were looking for a Mezzanine Floor with Longspan Racking. STS Storage Systems were consulted after Mills received a recommendation, the challenge was to offer a service which matched all of Mill’s requirements, expectations and budgets.

Read more »
Kelly's Storage case study STS Storage Systems

Kelly’s

Working with Kelly’s, STS Storage Systems, helped to increase the capacity of document storage boxes in line with the successful tender of a new contract. Having had the warehouse installed with mobile bases in preparation for future growth,we were brought in to compete with the incumbent supplier to offer a more cost effective solution and at the same time increase the box count.

Read more »
Cadogan Tate case study STS Storage Systems

Cadogan Tate

We were employed by Cadogan Tate to turn a warehouse full of large storage containers into an area suitable to securely hold precious items of furniture, art and associated valuables. With a warehouse boasting a volume of 13,000 m2 it was imperative to maximise the volume for Cadogan Tate’s clients.

Read more »
Coburn case study STS Storage Systems

Hillaldam Coburn

STS Storage Systems helped Hillaldam Coburn to relocate their business to a new fully operational 22,000 sq ft warehouse and office facility within a 5 week period. Time-scales for this project were essential as a dilapidation date had been set on their existing property.

Read more »
Dovetail publishing case study STS Storage Systems

Dovetail

(part of the BBC and Dennis Publishing Group)
Dovetail contacted STS Storage Systems to help them find a suitable premises around their current location in the Medway Kent area, helping them to bring together facilities in Bristol & Sittingbourne. Their new warehouse storage solution is built around our storage CAD design.

Read more »